Siemens 501 Fog Nozzle Retrofit

Fog Nozzle Retrofit

ECT retrofit 600 fog nozzles into each of two gas turbines for an overall output gain over  7%.  By changing out impingement pin nozzles and reconfiguring the nozzle grid,  ECT engineered a retrofit that allowed the end user to use a fogging skid that was previously shut down due to poor performance and creating large droplet erosion.

Contact ECT for an evaluation of your existing gas turbine crank wash procedure to see how we can help you lower your operating costs.

See what sets our nozles apart from the rest

Explore More Insights

Frame 7EA Skid and Nozzle Upgrade

Frame 7EA Skid and Nozzle Upgrade

Case Study: Wash Equipment Upgrade - Case Study: Wash Equipment Upgrade - ECT was tasked to engineer a wash equipment package to upgrade the wash skid, improved control functionality and add online cleaning capability to two (2) Frame 7EA gas turbine located on the...

read more
Power Augmentation Upgrade

Power Augmentation Upgrade

ECT custom power augmentation system in Houston generates a 14% improvement in output. ECT was contracted to provide our patented Power Augmentation System on five (5) Frame 7E’s in Houston. The target was 2% of incoming air mass yielding an output improvement of...

read more
Frame 7EA

Frame 7EA

Case study: Improved compressor wash efficiency with full system upgrade ECT was contracted to perform a full upgrade on two Frame 7EA units. The design goals were to use the existing crank wash nozzles provided by General Electric, design new online wash hardware and...