Clear Proof ECT Improves Performance:
Below are a series of case studies, each of which shows how ECT has saved customers real dollars and improved compressor performance in the field.
Click the "+" to read the results
-
Frame 7F:
A comparison test of gas turbine cleaning products on a Frame 7F in California
Case Study: Frame 7F - Improved Cleaning Efficiency with Lower Cost
ECT performed a comparison test of gas turbine cleaning products on a Frame 7F in California that is operated by a large wholesale power generation company. Read the case study
-
Frame 6:
ECT performed a comparison test of gas turbine cleaning hardware and compressor wash on a Frame 6Case Study: 4% Power Recovery by Improved Cleaning Efficiency- ECT performed a comparison test of gas turbine cleaning hardware and compressor wash on a Frame 6 that is operated under an LTSA by an OEM for a power generation Company in California. Read the case study for yourself
-
Siemens 501 Fog Nozzle Retrofit:
ECT retrofit 600 fog nozzles into each of two gas turbines for an overall output gain over 7%Case Study: Fog Nozzle Retrofit- ECT retrofit 600 fog nozzles into each of two gas turbines for an overall output gain over 7%. By changing out impingement pin nozzles and reconfiguring the nozzle grid, ECT engineered a retrofit that allowed the end user to use a fogging skid that was previously shut down due to poor performance and creating large droplet erosion. See what sets our nozles apart from the rest
-
Wash Skid Upgrade:
ECT engineered a package to upgrade the heaters and update the controls of a gas turbine wash tank.Case Study: Wash Tank Upgrade- ECT engineered a package to upgrade the heaters and update the controls of a gas turbine wash tank. The upgrade targeted an accelerated heat cycle that allows the user to improve their crank wash recoveries and reduce their crank wash time over 2 hours. See the full range of wash skids
-
LM2500:
ECT manufactured a custom online injection ring with removable nozzles and provided R-MC engine cleaner.Case Study: LM2500 Online Cleaning- ECT manufactured a custom online injection ring with removable nozzles and provided R-MC engine cleaner. The end user was able to maintain compressor performance between crank washes and nearly eliminate their crank wash program. Download the Complete Case Study PDF
-
Frame 7EA:
ECT was contracted to perform a full upgrade on two wash systems for Frame 7EA units.Case study: Improved compressor wash efficiency with full system upgrade- ECT was contracted to perform a full upgrade on two Frame 7EA units. The design goals were to use the existing crank wash nozzles provided by General Electric, design new online wash hardware and engineer the upgraded online/off-line wash skids. Read the case study for yourself
-
Power Augmentation Upgrade:
ECT custom power augmentation system in Houston generates a 14% improvement in output.ECT custom power augmentation system in Houston generates a 14% improvement in output.
ECT was contracted to provide our patented Power Augmentation System on five (5) Frame 7EA’s in Houston. The target was 2% of incoming air mass yielding an output improvement of approximately 14%. The total output was 9 megawatts on average per machine for a plant improvement totaling almost 45 megawatts. ...
Read the case study for yourself -
Frame 7EA Skid and Nozzle Upgrade:
Case Study: Wash Equipment Upgrade - ECT was tasked to engineer a wash equipment packageWash Equipment Upgrade - ECT was tasked to engineer a wash equipment package
ECT was tasked to engineer a wash equipment package to upgrade the wash skid, improved control functionality and add online cleaning capability to two (2) Frame 7EA gas turbine located on the east coast. . ...
Read the case study for yourself
RELATED CONTENT
Contact Details
- 338 Circle Of Progress Dr.
Pottstown, PA 19464 - +1 610-239-5120
- +1 610-239-7863
- +1 800-323-1805
- info@ectinc.net
- support@ectinc.net
- Contact ECT